IMPIANTI OMS S.p.A.

 


News
 
19/05/2010 - [ news ]
PPI & OMS Help Insulated Panel Manufacturers Use Less Energy & Chemicals
 
16/03/2010 - [ news ]
LOW PRESSURE MACHINE FOR TPU SYSTEMS
 
22/09/2009 - [ news ]
GLASS ENCAPSULATION
 
27/04/2009 - [ news ]
OMS AND PPI TO EMPHASIZE INSULATING PANELS AND ELASTOMERS AT NPE2009
 
12/03/2009 - [ news ]
PIPE COATING SOLUTIONS SUPPLIED TO BREDERO SHAW
 
13/02/2009 - [ news ]
OMS GROUP AT UTECH 2009: THE LAUNCH OF THE NEW ECOPLUS
 
10/02/2009 - [ news ]
HENAN XINFEI – NEW PLANT FOR THE PRODUCTION OF
 
06/02/2009 - [ news ]
OMS GROUP SECURES SECOND PLANT FOR PUREN
 
22/01/2009 - [ news ]
OMS GROUP: 40 YEARS ON - PASSION & PROGRESS
 
23/01/2008 - [ news ]
OMS GROUP SELECTS POLYURETHANE PROCESS INDUSTRIES AS SOLE U.S. DISTRIBUTOR
 
24/10/2007 - [ news ]
GORENJE – INTERVIEW WITH A SATISFIED CUSTOMER
 
24/10/2007 - [ news ]
ROTAKOTE GRAVURE CYLINDER SYSTEM
 
24/10/2007 - [ news ]
ECOFILLER DSB AND CSB OFFER COST AND ENVIRONMENTAL ADVANTAGES
 
24/10/2007 - [ news ]
SNUGGLEDOWN RESTS EASY WITH OMS
 
24/10/2007 - [ news ]
AIR FILTERS : “NICHE, BUT NICE”
AIR FILTERS : “NICHE, BUT NICE”
 
24/10/2007 - [ news ]
PIPELINE INDUCTION HEAT RULES THE WAVES
 
24/10/2007 - [ news ]
PHENOLIC PHENOMENON
 
24/10/2007 - [ news ]
ENERGY EFFICIENCY AND SAFETY CONTINUOUSLY COMBINED !
 
24/10/2007 - [ news ]
A BREATH OF FRESH–AIR FROM EUROPAN
 
24/10/2007 - [ news ]
PUREN TOP-PERFORMANCE FROM “TOP-LINE”
 
24/10/2007 - [ news ]
DCPD: AN INTERESTING ALTERNATIVE TO R-RIM
 
24/10/2007 - [ news ]
FROM HANDCASTING TO HI-TECH FOR INPIPE
 
24/10/2007 - [ news ]
KEEPING COOL AROUND THE WORLD
 
24/10/2007 - [ news ]
BE IN CONTROL WITH P.D.S.
 
24/10/2007 - [ news ]
ANOTHER WAY TO DO R-RIM
 
24/10/2007 - [ news ]
BEAUTIFUL PANELS FROM POLISTAMP
 
24/10/2007 - [ news ]
LANCE SYSTEM : THE RIGHT BALANCE BETWEEN COST AND QUALITY !
 
04/10/2007 - [ news ]
Continuous Panel Experience Pays Dividends
 

12/03/2009 - PIPE COATING SOLUTIONS SUPPLIED TO BREDERO SHAW


PIPE COATING SOLUTIONS SUPPLIED TO BREDERO SHAW

In mid-2008 Bredero Shaw, a subsidiary of ShawCor Limited, was awarded the contract to produce 40 kilometres of coated insulated pipeline.
 
Required to satisfy the needs of Sabah Shell Petroleum's Gumusut-Kakap Deepwater Project, these 18" (457mm) diameter pipes are protected with Fusion Bonded Epoxy (FBE) and Bredero Shaw's ThermoFlo D glass syntactic polyurethane insulation coating which is designed for water depths up to 1,200 metres. The Gumusut-Kakap Deepwater Project is located in the South China Sea some 120 km offshore the island of Sabah.
 
This large scale project is being handled through Bredero Shaw's facility in Kuantan, Malaysia which, with over 600,000 square metres of plant and pipe storage area available, makes it the largest pipe coating facility in the world. Already acknowledged as a world leader in pipe coating solutions Bredero Shaw has extensive facilities to ensure pipe coating contracts can be fulfilled on a local basis anywhere in the world.
 
To complete the Gumusut-Kakap coating process a special purpose Impact 300S metering unit has been supplied by OMS Group and installed at the Kuantan facility. The machine has a total maximum output of 300 kg/min and features a special twin pump arrangement to enable syntactic formulations containing either polymer or glass microspheres to be processed without risk of damage to the delicate speres. This is absolutely essential to ensure the required insulation and buoyancy properties of the finished pipe are maintained.
 
In order to ensure absolute precision of the moulding process throughout the lengthy pouring cycle, the machine is fitted with mass flow meters and closed loop control of output and ratio to guarantee accurate control over mix quality. A special software program enables the start and end of pouring to be on a controlled ramp up / ramp down basis thus helping the operator to build up and reduce delivery rates at the start and end of the moulding process.
 
Materials are stored in temperature conditioned day tanks of 2000 litre capacity for Isocyanate and 5,000 litres for Polyol and both are fitted with thermoregulation unit, automatic level controllers and agitators to ensure the materials are always processed at the correct temperature.
 
Having previously been chosen to supply Bredero Shaw's machinery requirements elsewhere in the Group, it was particularly pleasing for OMS Group to be selected again for equipment to fulfil this arduous and exacting project.

 
 
Italiano      English      China